

| RECENT PROJECTS |





| BEFORE Boat ramp in Sanford,FL |
| BEFORE Aluminum wall and return connection in Sanford, FL |
| Complete aluminum panel installation and concrete cap |
| BEFORE Aluminum panels installed with tie backs and 15" RC Pipe |
| AFTER Back fill, Concrete Cap and Grading Complete. |


| DURING Unloading boat ramp mats |
| Difficult "S" Curve Created with a Template for the Panels and Concrete Cap |
| DURING The 1st Mat has been placed and Attached to the Seawall Cap. |

| BEFORE Location for 1st set of revetment mats |

| AFTER Revetment mats are filled with beach sand. Gap between mats and cap are poured with concrete |






| VERO BEACH SEAWALL 209lf of Vinyl Panels with a Double Whale System, Concrete Deadmen and Concrete Cap This project was a testament to the drive, teamwork and pride Antinori Management Group, Inc. pours into our work. The 209lf wall with 25' Vinyl panel wall was installed in 13 days. Our crew worked 7 days a week, 18 hours a day to complete the panel installation. We had to clear the beach on March 1, 2007, due to the D.E.P. regulated turtle season. |

| CAPTAINS QUARTER'S CONDOMINIUM SEAWALL |

| FOREVER HOMES SEAWALL & DOCK Design/Build, DEP and local permitting of 208lf of composite panels, Coquina revetment & Dock with Boathouse. |

| PONCE INLET SEAWALL Design/Build, DEP and local permitting for 537lf of vinyl seawall |





| HARBOR VIEW DEVELOPMENT 310 lf of vinyl seawall with concrete cap and 4 residential covered boat docks |
