RECENT PROJECTS
BEFORE
Boat ramp in Sanford,FL
BEFORE   
Aluminum wall and return connection in Sanford, F
L
City of Sanford:  1,400 lf of Aluminum Seawall,  Articulating Block
Revetment and Articulating block/ Concrete boat ramp.  
Complete aluminum panel installation and concrete cap
BEFORE
Aluminum panels installed with tie backs and 15" RC
Pipe
AFTER
Back fill, Concrete Cap and Grading Complete.
DURING
Unloading boat ramp mats
Difficult  "S" Curve Created with a Template for the Panels
and Concrete Cap
DURING
The 1st Mat has been placed and Attached to the Seawall Cap.
BEFORE
Location  for 1st set of revetment mats
COMPLETED BOAT RAMP WITH SECTIONS ARTICULATING BLOCK AND POURED CONCRETE
AFTER
Revetment mats are filled with beach sand. Gap between
mats and cap are poured with concrete
VERO BEACH SEAWALL

209lf of  Vinyl Panels with a Double Whale System, Concrete Deadmen  and Concrete Cap

This project was a testament to the drive, teamwork and pride Antinori Management Group, Inc.
pours into our work.  The 209lf  wall with 25' Vinyl panel wall was installed in 13 days.   Our crew
worked  7 days a week, 18 hours a day to complete the panel installation.  We had to clear the beach
on March 1, 2007, due to the D.E.P. regulated turtle season.
CAPTAINS QUARTER'S CONDOMINIUM
SEAWALL
FOREVER HOMES SEAWALL & DOCK

Design/Build, DEP and local permitting of 208lf of composite
panels, Coquina revetment & Dock with Boathouse.
PONCE INLET SEAWALL
Design/Build, DEP and local permitting for 537lf of vinyl seawall

HARBOR VIEW DEVELOPMENT

310 lf of vinyl seawall with concrete cap and 4
residential covered boat docks